FGD Configurations
Arrangements As power generation plant needs evolved, Evonik Steag was able to draw on its wealth of experience to install new FGD systems and retrofit old systems successfully in a variety of arrangements even when there were serious space restrictions. With innovative and creating thinking outside the box, Evonik Steag has developed the expertise to engineer multiple unit designs.

5 FD-fans feed 5 boilers and push the flue gas into 5 retrofitted high-dust SCRs. 2 ID-fans pull the flue gas through 2 parallel APC trains and discharge it into a single common stack. The pressure in the combustion furnace is controlled by the FD-fans
|